Afghan National Army (ANA) Logistics and Acquisition Command Headquarters Renovation, Phase 2

Afghan National Army (ANA) Logistics and Acquisition Command Headquarters Renovation, Phase 2

Project Description

This effort involved the renovation of Afghan National Army Logistics and Acquisition Command Headquarters Compound (ANA LAC), an Afghan National Army base with office space for approximately 1,200 administrative personnel and housing for roughly 450 permanent resident personnel.

The project included design-renovation-build of 15 buildings. Technologists, Inc. had to incorporate new structures into the existing campus layout during normal operations—which presented a design and construction challenge. Ti built flexible spaces to address fluid functional requirements. Key work included:

  • Preparing the site master plan
  • Repair, renovation and upgrade of existing offices and warehouses
  • Complete design and construction of kitchen, dining facilities, showers, latrines, barracks and a guard tower

Ti designed and installed a new power generation plant and electric distribution system for this project. We designed and installed a complete potable water supply and distribution system and sewer system. We upgraded the military parking areas and constructed 1.6 km of paved roads and 1 km of gravel roads. We renovated and improved the perimeter wall security in accordance with the anti-terrorist/force protection measures.

Options exercised nearly doubled the project budget. Change orders and modifications included design and construction of a new communications building, increasing security measures such as extending existing fencing and new stone walls, and upgrades to kitchen features—including stoves and refrigerators.

In addition to the contract’s defined scope of work, Ti performed pro-bono work and completely refurbished the mosque on the compound, which had fallen into disrepair during a generation of conflict.